Syracuse Extension Colorado

VVC helium project in eastern Colorado in an area with average helium concentrations of 3% and discoveries with a concentration over 7%

28

Previously drilled, tested, capped – low dry hole risk

3%

Or above He

320

Potential Well sites

The Syracuse Extension Colorado Project is located in a relatively high helium concentration area and connected to the Ladder Creek Processing Plant.


OPPORTUNITY



  • Internal estimates of future resource of 90.5 Bcf of gas (including the Syracuse Ext Kansas Project) 
  • Estimated recovery of 1.2 Bcf per Well based on production history in the area
  • Average Well has a higher initial production rate, higher BTU and higher helium concentration producing a more valuable gas stream







Quick Facts

Location Eastern Colorado
Target Helium
Size of the property 5,564 acres
Stage Permitted
Share by: